SGSM Keener Arm Unit Installation
-
Attach mounting arm assemblies to unit with clamp screw end of the channel facing the rear side of the unit. Torque mounting bolts that fasten mounting arms to the unit to 203 Nm (150 ft-lb).
-
Place mounting arm clamp screw assemblies in open (down) position.
-
Open each slider channel at least 200 mm (8 in.).
-
Move the unit under container or trailer chassis. Place fixed gripper channels on unit over edge of chassis I-beam.
-
Seat the chassis I-beam against the back of both fixed gripper channels. Move each slider channel forward over the back edge of the chassis I-beam.
-
Place the eye bolts over the slider pins by adjusting the bolt length as necessary.
-
Insert quick release pins in eye bolt handles to lock the eye bolts in the closed (lock) position.
-
Place the clamp screw assemblies on the rear edge of the second chassis I-beam.
-
Seat each clamp firmly against the edge of the I-beam and tighten clamp screw. Torque each clamp screw to 203 Nm (150 ft-lb).
1. | Clamp Channel | 7. | Unit |
2. | Clamp Screw | 8. | Unit Mounting Bracket Assembly |
3. | Mounting Arm Clamp | 9. | Chain and Quick Release Pin |
4. | Mounting Arm Tube | 10. | Eye Bolt |
5. | Slider Channel | 11 | Slider Pin |
6. | Fixed Gripper Channel |