SGCO Clip-on Corner Clamp Unit Installation
-
Pull the lock pawl handle forward. Lift the clamp handle to rotate the clamp shaft 90 Degrees.
-
Lift the unit into mounting position on front wall of the container. The foot of generator set mounting clamp should fit into mounting hole on each side of the container.
-
Insert the foot of the mounting clamp fully into the container mounting hole. Pull lock pawl handle forward. Pull the clamp handle down to rotate the clamp shaft bolt 90° and clamp generator set to container.
-
Release the lock pawl to hold the clamp handle in the locked (down) position.
-
Check to be sure the generator set frame fits tightly against the container. Turning the mounting clamp handle should pull the generator set frame tight against the container front wall. If necessary, tighten the mounting clamp. The mounting clamp can be tightened or loosened by turning the nut on the head of the clamp shaft.
1. Lift (Unlock) Lock Pawl 5. Lift (Unlock) Lock Pawl 2. Rotate Clamp Handle Up 90 degrees 6. Rotate Clamp Handle Down 90 degrees 3. Release (Lower) Lock Pawl 7. Release (Lower) Lock Pawl 4. Insert Mounting Clamp Foot in Container Mounting Hole -
Install the lower mounting bolts:
-
Remove the retaining pin from the lower mounting bracket.
-
Remove the mounting bolt and backup plate from the keeper nut. Put the mounting bolt through the backup plate and install the bolt in the mounting hole.
-
Tighten the lower mounting bolts to 300 to 380 Nm (220 to 280 ft-lb).
-
Install the retaining pin and hair pin key to prevent accidental loss of the mounting bolt and backup plate during unit operation.
-