SGCM Unit Installation

  1. Attach the mounting arm assemblies on each end of the unit.

    1. Fasten Chassis Clips on the Outside Edge of each I-Beam and Tighten Bolts
    2. Tighten Mounting Arm to Unit Bolts
  2. Move the unit under container or trailer chassis. Place each mounting clip on top of a chassis frame member. Locate each clip as close to the vertical web of the chassis member as possible.

      Caution
    • Service Procedures
    • Keep all container or trailer electrical lines and air lines away from the clips to prevent damage during unit installation and operation.

  3. Torque the mounting bolts:

    • Mounting Arm to Unit Frame: 88 to 115 Nm (65 to 85 ft-lb)

    • Chassis Clip Bolt: 162 to 176 Nm (120 to 130 ft-lb)