SGCM Unit Installation
-
Attach the mounting arm assemblies on each end of the unit.
1. Fasten Chassis Clips on the Outside Edge of each I-Beam and Tighten Bolts 2. Tighten Mounting Arm to Unit Bolts -
Move the unit under container or trailer chassis. Place each mounting clip on top of a chassis frame member. Locate each clip as close to the vertical web of the chassis member as possible.
-
Torque the mounting bolts:
-
Mounting Arm to Unit Frame: 88 to 115 Nm (65 to 85 ft-lb)
-
Chassis Clip Bolt: 162 to 176 Nm (120 to 130 ft-lb)
-