High Pressure Cutout Switch Replacement
Removal
-
Close the suction service valve and pump down the compressor:
-
R-134a Compressor: Pump down the compressor to -35 kPa, -0.35 bar, 10 in. vacuum.
-
R-23 Compressor: Pump down the compressor to 0 to 21 kPa, 0.0 to 0.2 bar, 0 to 3 psig.
-
-
Open the suction service valve slightly to equalize the pressure between 10 and 20 kPa, 0.10 and 0.20 bar, 1 and 3 psig.
-
Front seat the discharge service valve.
-
Purge the high pressure from the compressor head through the service port on the discharge line.
-
Disconnect the leads from the wire harness and remove the switch from the compressor discharge manifold (or remove the sensor from the compressor head).
Installation
-
Apply a refrigeration locktite (sealant) to the threads of the switch (or sensor).
-
Install and tighten the switch (or sensor). Connect the leads to the wire harness.
-
Open discharge service valve slightly to pressurize the compressor head and tube assembly. Check for leaks (see “Refrigerant Leak Test Procedure” in this chapter). Front seat the discharge service valve.
-
If no leaks are found, recover the leak test gas (see “Refrigerant Recovery” in this chapter).
-
Open the suction service valve and compressor discharge service valve and place the unit in operation.