Pre-trip Testing
Allows the User to test the genset for ability to perform a self-diagnostic test prior to sending the unit out for operation. The test verifies no operational issues prior to Genset being put into service
-
PTI is initiated by pressing and holding the F1 button while unit is waiting to start.
-
When initiated, the controller will begin the engine start sequence from the beginning of the buzzer alert .
-
Genest is to bypass the 2 mins excitation delay and then test the high and low speed operation of the genset. The controller shall also test generator output voltage at those speeds.
-
Pass = Controller to receive appropriate run confirmation from the Yanmar ECU, the generator and any internal DSE specific operations
-
Fail = Lack of receipt of appropriate run confirmation from the Yanmar ECU, the generator and any internal DSE specific operations
-
All items in the below Manual function test sub menu shall be validated and logged for “Pass” or “Fail