Installation Qualification
Prepared for Thermo King, for validation of temperature-controlled equipment Multi-Temperatures units for truck:
T-1000R Spectrum, T-1200R Spectrum, UT-1200 Spectrum and UT-R Spectrum
For each individual equipment (truck + body + refrigerated unit) a specific TK PharmaSolutions - IQOQ Check-MUL document must be completed by the Thermo King official dealer to confirm that Installation Qualification conforms to the requirements of the Design Qualification: GDP-TK-DQ-SP-MT. The latest valid revision of this document must be used and is available from Thermo King EMEA InfoCentral intranet.
The vehicle has been inspected and conforms to the design qualification document GDP-TK-DQ-SP-MT. Photographic evidence is available on request.
-
Door switches are installed, and the unit is configured to force ZONE NULL when opening the doors. Thermal curtains are recommended as described in GDP-TK-DQ-SP-MT.
-
The transversal movable dividing wall as defined in GDP-TK-DQ-SP-MT is installed and displacement is in accordance with Load Space Considerations described in GDP-TK-OQ-SP-MT.
-
Thermo King S3 remote evaporators are installed in each of the 2 zones. Evaporator fans are to be configured to run in NULL mode as described in GDP-TK-DQ-SP-MT.
-
The specific configuration file as described in GDP-TK-DQ-SP-MT is loaded to the unit controller.
-
A temperature datalogger as described in GDP-TK-DQ-SP-MT with at least one sensor in each zone is installed and configured as per customer settings. Thermo King DAS or TouchPrint Datalogger are recommended.