Operational Qualification Checklist
For each individual equipment (vehicle + refrigerated unit) a specific TK PharmaSolutions - IQOQ Check-MUL document has to be completed
            by the Thermo King official dealer. The latest valid revision of this
            document has to be used and is available from Thermo King EMEA InfoCentral
            intranet.
This document confirms that:
            
- 
                  Installation is conducted as per GDP-TK-DQ-TR-MT_A. 
- 
                  A 3-temperature calibration check has been performed and the results attached to this document. The results are also available on request in electronic format. 
- 
                  All required risk management and due diligence protocols are in place and comply with the GDP requirements. This protocol's minimum requirements should be: - 
                           Scheduled Maintenance 
- 
                           Breakdown repairs 
- 
                           Annual 3-temperatures calibration check 
- 
                           Availability of Service History 
- 
                           Asset Management 
 
- 
                           
 
     
        
  