SP Truck Multi-Temperature
- Chapter 1: Safety Precautions
- 1.1: Danger, Warning, Caution, and Notice
- 1.2: Auto Start Hazards
- 1.3: Battery Installation and Cable Routing
- 1.4: TK Lithium Ion Battery Safety
- 1.5: Refrigerant Hazards
- 1.6: Refrigerant Oil Hazards
- 1.7: Electrical Hazards
- 1.8: Controller/Microprocessor Service Precautions
- 1.9: Welding Precautions
- 1.10: First Aid
- Chapter 2: Qualification Plan
- T-1000R Spectrum, T-1200R Spectrum, UT-1200 Spectrum and UT-R Spectrum
- Purpose
- User Requirements Specifications (URS)
- Overall Qualification Results
- Design Qualification (DQ)
- Installation Qualification (IQ)
- Operational Qualification (OQ)
- Performance Qualification (PQ)
- Qualification with a Sample–Type Approach
- Responsibility
- Qualification Facility
- Chapter 3: Risk Analysis Thermo King
- Chapter 4: Design Qualification
- Chapter 5: Installation Qualification
- Chapter 6: Operational Qualification
- Chapter 7: Performance Qualification
- 7.1: Introduction
- 7.2: Purpose
- 7.3: Scope
- 7.4: Evaluation of the Qualification Test
- T-1200R Spectrum S3+S3 - Multi-temperatures Tests
- T-1200R Spectrum S3+S3 - Single-temperature Tests
- T-1000R Spectrum S3+S3 - Multi-temperatures tests
- T-1000R Spectrum S3+S3 - Single-temperature Tests
- UT-1200 Spectrum S3+S3 - Multi-Temperatures Tests
- UT-1200 Spectrum S3+S3 - Single-temperature Tests
- UT-R Spectrum S3+S3 - Multi-Temperatures Tests
- UT-R Spectrum S3+S3 – Single Temperature tests
- 7.5: Hotspot / Coldspot Identification
- 7.6: Recommendations
- Chapter 8: Appendix